Leaders in Oil and Gas Construction
Home | -->Call Us 307-537-3467<--Sitemap

 

Current Operations

 

Central Gathering Facility #1 Pipeline

 

This project consisted of the installation of 124, 511 lf of multiple sized Fiberspar piping and 6” Flex Steel piping. There was a total of 118 high pressure gas line crossings and 29 road crossings. This project was completed in 86 working days.
 

 Central Gathering Facility #3 Pipeline

 

This project consisted of the installation of 216,609 lf of multiple sized Fiberspar piping and 6” Flex Steel piping. There was a total of 142 high pressure gas line crossings and 38 road crossings. This project was completed in 95 working days.
 

SIMOPS Facilities

We currently construct on average 7 SIMOP facilities per year. SIMOP facility construction includes site work, welding and installation of production lines.

These projects consisted of the construction of flow lines, dehydration units, dump lines, tank batteries, line heaters and sales lines.
 

 Frac and Work Over Rigs

This work consists of the rigging up of completion equipment, installing valves, separators and sand traps and the installation of all production lines. This work also consists of the relocation of equipment with boom trucks and winch trucks.

 

Whiting Petroleum

A&T Welding is currently installing 3" and 4" pipeline laterals for Whiting Petroleum near Newtown, ND. This project will also include plumbing and fabrication of tank batteries along with providing flow metering and tank guaging services.

 

Questar Field Services

Earlier this year, A&T Welding constructed a 10" pipeline South of Rock Springs, WY for Questar. The pipeline project is complete with valve settings.

We are currently working near Parshall, ND constructing 4" and 6" pipeline laterals and setting up and completing LGS transfer sites for Questar.

 

Denbury Resources

A&T Welding is entering the final phase of construction to complete multiple sites along a new pipeline from Gillete, WY to Casper, Wy for Denbury Resources. This project includes setting meter buildings and fabrication of a remote telemetry system.

 

Ultra Resources

A&T Welding is also working for Ultra Resources in Pinedale, Wy. Throughout the remainder of this year we will start and complete mutliple projects ranging from construction of 3" Pipeline laterals to the installation of a compressor site.